Understanding the Budget Products View in INNERGY

Overview

The Budget Products tab is the central hub for reviewing all products assigned to a project budget. It organizes line items by physical location, displays a full pricing breakdown across drafting, fabrication, and install, and provides robust filtering and view controls so your team can work efficiently at any stage of the project lifecycle.

How to Access Budget Products

  1. Open any active project from the Projects list.

  2. Click the Budget tab in the top project navigation bar.

  3. In the sub-navigation row that appears, click Products.

Navigation path: Projects → [Your Project] → Budget → Products

Page Layout

When you land on the Budget Products view, you'll see three key areas:

Project Status Bar (top) — displays real-time project health indicators including Status, Workflow stage, Contract Pending status, Checklist completion, and contract dollar values (Original Contract Value, Current Contract Value, and Work Orders Value).

⚠️ Note: If the Work Orders Value appears highlighted in red, this signals that committed work order costs are approaching your contract ceiling. Review immediately.

Budget Products Grid (center) — the main data table showing all products organized by location group.

Grid Controls (top-right) — tools for collapsing groups, changing views, and exporting data.

Understanding the Grid

Location Groups

Products in the Budget Products view are organized by Location — the physical area, room, or zone within the project where each product will be installed, if you group the grid by location. Then it appears as a collapsible group header, with its associated product line items nested underneath.

Common location group examples:

  • Floor-level zones (e.g., L7 Restrooms, L8 Market, L8 Coffee)

  • Functional spaces (e.g., Breakout, Hallway, Security Podiums)

  • Special origin groups (e.g., Project Origin: RFCA3 - Addendum)(Your Estimating team should be determining Location, Building, and Zone at the bid level to make this easier to visualize once you win the project.

Column Definitions

Column

Description

Products

The product name or description assigned to the project budget

Total Drafting Price

Cost for design/drafting labor associated with the product

Total Fabrication Price

Manufacturing and production cost

Total Install Price

On-site labor and installation cost

Grand Total Price

Sum of Drafting + Fabrication + Install — the all-in cost per item

Totals Row

The bottom row of the grid displays aggregate totals across all visible products:

  • Item count — total number of product line items

  • Total Fabrication Price — sum of all fabrication costs

  • Total Install Price — sum of all install costs

  • Grand Total Price — full all-in budget commitment for products

Best Practice: Regularly compare the Grand Total against your Current Contract Value to ensure alignment throughout the project lifecycle.

Grid Controls and Features

Show Accepted / Show All

Located at the top of the grid:

  • Show Accepted — filters the view to display only formally accepted products. Use this to assess locked-in scope.

  • Show All — displays the full product list, including pending and draft items.

Expand / Collapse Groups

Located in the top-right corner of the grid:

  • Collapse Groups — compresses all location groups to header-only rows, giving you a high-level summary of locations and their totals without the individual line items.

  • Expand Groups — expands all groups to show full product detail.

Tip: Use Collapse Groups when presenting a budget overview to stakeholders. Expand Groups when doing a detailed line-item review.

Column Search and Filtering

Each column in the Budget Products grid has an active search field. Type into any column's search bar to filter products by that attribute — useful on large projects with many locations and hundreds of line items.

Default View / Custom Views

The Default View dropdown (top-right) allows you to switch between saved column configurations. INNERGY supports named views so different roles (Project Managers, Estimators, Shop Managers) can each access the column layout most relevant to their work.

Create Filter

At the bottom of the grid, the Create Filter option allows you to build and save complex multi-column filter logic. Saved filters persist across sessions and can be reused on future visits to the same project.

Pagination

At the bottom of the grid, choose how many items to display per page: 25 / 50 / 100. For large projects, increasing this number reduces the need to page through records.


Related Budget Sub-Tabs

The Budget Products view is one of several sub-tabs under the Budget module. The full set includes:

Tab

Purpose

Products

All budgeted products organized by location

Materials

Raw material line items

Estimated Materials

Pre-bid or estimated material quantities

Material Approvals

Approval workflow for material selections

Labor

Labor hours and cost by trade

Distributed Costs

Shared/overhead costs allocated across products

Overheads

Project-level overhead entries

BOM

Bill of Materials breakdown


Frequently Asked Questions

Q: Why do some location groups show $0.00 with no items? A: This is expected behavior. Locations are often created during project setup before products are assigned. As the estimating or design process progresses, items will populate under those groups.

Q: What does it mean when the Work Orders Value is in red? A: Red indicates that the value of committed work orders is approaching or exceeding the contract ceiling. Review your Work Orders and Contract sections immediately to assess exposure.

Q: Can I add or edit products directly from this view? A: The Budget Products view is primarily a read and review interface. To add or modify products, use the Alternates option in Takeoff or Change Orders for Projects.

Q: How do I save a custom column layout? A: Use the Default View dropdown to access view management. Create and name a new view with your preferred column configuration so it can be recalled anytime.


Related Articles

  • Understanding the Budget Tab Overview

  • How to Review Job Costing in INNERGY

  • Working with Work Orders and Contract Values

  • Using Filters and Views in INNERGY Grids

  • The BOM (Bill of Materials) Tab Explained

Did this answer your question?